
Dillard Street Elementary School sits on N. Dillard Street in downtown Winter Garden, an Orange County Public Schools campus serving roughly 480 students in grades pre-kindergarten through five. Grassland carried out a full electrical renovation of the school, one of the smaller and older campuses in the district, while classes stayed in session throughout.
Age changes the nature of a renovation like this. Older buildings rarely match their original drawings after decades of small fixes and additions, so a good part of the work was diagnostic before it was ever electrical: tracing circuits, confirming what was actually behind each wall, and building a shutdown sequence around what the building really needed rather than what a set of plans assumed. Grassland has carried out renovations like this across Central Florida school districts, and Dillard Street never lost a day of instruction to the work.
What we deliver on projects like this
Interested in partnering with Grassland?
(407) 298-2494 · info@grasslandenterprisesinc.com



